| Structure |
Reinforced Cement Concrete Footings & Frame work.
**(Use of MIVAN Forming System) |
| Walls |
Concrete walls |
| Roof |
Reinforced Cement Concrete Roofing |
| Ceiling |
Smooth finish & Paint False ceiling in bathrooms |
| Windows |
Bedroom, Kitchen |
UPVC / Aluminum Windows |
Bathrooms |
Fixed Louvers |
| Doors |
Main Door |
Teak Wood Frame with Decorative Shutters |
| Other |
Teak Wood Frame with Flush Shutter Door |
| Balcony |
UPVC / Aluminum Framed Sliding Door |
| Floor Finishes |
Living, Dining, Bedrooms |
Vitrified Tiles with skirting |
| Kitchen, Bathroom & Balcony |
Non-Slip Ceramic Tiles |
| Wall Finishes |
Interior |
Smooth Finish Plaster & Plastic Emulsion Paint |
| Exterior |
Sponge Finish Plaster & Weather Proof Paint |
| Bathroom |
Ceramic Tiles to 2100mm height |
| Kitchen |
Ceramic Tiles to 600mm height above counter level |
| Sanitary Fittings |
Toilets |
EWC, Washbasin, Shower Rose & Geyser Provision. |
Kitchen |
Bare Kitchen to suit owner’s convenience. |
| Electrical |
Sufficient Electrical Points, One Split A/C, One Desert Cooler |
| Lift |
1 Passenger lift & 1 Goods lift |